My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-3237
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-3237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:23:45 PM
Creation date
2/1/2007 8:12:00 AM
Metadata
Fields
Template:
Building Department
Permit #
04-3237
Building Department - Name
KOB PROPERTIES LLC
Address
301 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Permit No.: 44024630.002 <br />February 13, 2004 <br />Page 4 <br /> <br />4. Within 30 days after completion of construction of the permitted activity, the Permittee shall submit <br />to the Brooksville Service Office a written statement of completion and certification by a registered <br />professional engineer or other appropriate individual as authorized by faw, utilizing the required <br />Statement of Completion and Request for Transfer to Operation Entity form identified in Chapter <br />400-1, F.A.C.. and signed, dated and sealed as-built drawings. The as-built drawings shall identify <br />any deviations from the approved construction drawings. <br /> <br />5, The District reserves the right, upon prior notice to the Permittee, to conduct on-site research to <br />assess the pollutant removal efficiency of the surface water management system. The Permittee <br />may be required to Cooperate in this regard by allowing on-site access by District representatives, <br />by allowing the installation and operation of testing and monitoring equipment. and by allowing <br />other assistance measures as needed on site. <br /> <br />6, The operation and maintenance entity shall submit inspection reports in the form required by the <br />District, in accordance with the following schedule. <br /> <br />For systems utilizing retention or wet detention, the inspections shall be performed two (2) years <br />after operation is authorized and every two (2) years thereafter. <br /> <br />7_ If limestone bedrock is encountered during construction of the surface water management <br />system, the District must be notified and construCTion in the affected area shall cease. <br /> <br />8. The Permittee shall notify the District of any sinkhole development in the surface water <br />management system within 48 hours of discovery and must submit a detailed sinkhole evaluation <br />and repair plan for approval by the District within 30 days of discovery. <br /> <br />9. The District, upon prior notice to the Permittee, may conduct on-site inspections to assess the <br />effectiveness of the erosion control barriers and .other measures em ployed to prevent violations of <br />state water quality standards and,avoid downstream impacts. Such barriers or other measures <br />should control discharges. erosion, and sediment transport during construction and thereafter. <br />The District will also determine any potential environmental problems that may develop as a result <br />01 leaving or removing the barriers and other measures during construction or after construction of <br />the project has been completed. The Permittee must provide any remedial measures that are <br />needed. <br /> <br />1 Q. Refer to GENERAL CONDITIONS No, 15 herein. <br /> <br />GENERAL CONDITIONS <br /> <br />, , The general conditions attached hereto as Exhibit t'A" are hereby incorporated into this permit by <br />reference and the Permittee shall comply with them. <br /> <br /> <br />Aut ori SIgnature <br />PAUL v 'Ell JR., P.E., lrJTERIM DIRECTOR <br />BI100KSVILLE' REGULATION DEPARTMENT .~ <br /> <br />813 39'v'd <br /> <br />ON! S~31N30 3~!ONOO <br /> <br />136L1388PIP6 <br /> <br />PE:II P13130/P0/913 <br />
The URL can be used to link to this page
Your browser does not support the video tag.