My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10233
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 1:54:25 PM
Creation date
1/27/2011 1:54:21 PM
Metadata
Fields
Template:
Building Department
Company Name
FLORIDA HOSPITAL OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
10-10233
Building Department - Name
FLORIDA HOSPITAL OF ZEPHYRHILLS
Address
7050 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G310A -A <br /> Revised February 20, 2007 Page 17 <br /> SONIC RECEIVER TEST PROCEDURES DISENGAGED <br /> (Continued) <br /> 4. Verify that the electric or qas shutoff has been <br /> activated by observing the test results. fU �Q <br /> See "TEST RESULTS" below. <br /> 5. Once the shutoff (electric or gas) has activated, ir <br /> reconnect the positive ( +) #2 heat sensor terminal ?? O <br /> wire connection (red lug) to the CPU board terminal t 0 0 <br /> block, See FIGURE 3, Page 5. Once reconnected <br /> the CPU board audible alarm will cease to sound 0 <br /> and the CPU board will automatically reset itself. RELEASE <br /> Observe that the red LED light beside the battery SOLENOID <br /> holder blinks approximately every 45 seconds once FIGURE 26 LATCH <br /> again. This indicates the CPU board has reset itself ENGAGED <br /> and the unit is operating. AFTER A DISCHARGE <br /> TEST RESULTS IN THE EVENT A FIRE SHOULD OCCUR AFTER <br /> THE GUARDIAN III SYSTEM HAS BEEN <br /> INSTALLED AND EXTINGUISHED A FIRE, <br /> Electric Stove Shutoff Unit: Burner coil heat PROCEED AS FOLLOWS: <br /> has decreased and all electrical power to the stove has <br /> been shut off, i.e. stove power light is off. Turn RECHARGE / REACTIVATION OF SYSTEM <br /> burner to OFF position. Reset the electric shutoff <br /> unit as outlined on Page 10 - FIGURE 15. CAUTION: Before replacing the fire suppressant <br /> agent, the extinguisher cylinder, release valve <br /> Gas Stove Shutoff Unit: Burner is no longer lit assembly, or other system components, it is <br /> and all gas to the stove has been shut off, i.e., other recommended to wear approved type eye <br /> burners cannot be lit. Electricity is turned off if Gas protection and rubber gloves. <br /> Shutoff P/N G316 -A assembly is used. Turn burner to <br /> OFF position. Reset the gas shutoff unit as outlined 1. Remove the 9V DC battery from the CPU board. <br /> on Page 12. <br /> 2. Disconnect heat sensor 1 & 2 terminal wire <br /> connections from the CPU board and remove the <br /> CAUTION: If the Guardian III Model G300 -A fails to heat sensors from underneath the range hood. <br /> operate as described for either the Interconnect Cable Both heat sensors may require replacement. <br /> or the Sonic Receiver configuration, contact the (P /N G305 -1 and G305 -2) <br /> company the unit was purchased from or Twenty First <br /> Century for an authorized Twenty First Century NOTE: Insure pressure gauge indicator needle is <br /> service center for assistance. in the "Recharge" area of the gauge face prior to <br /> disconnecting the quick connect. <br /> ARMING YOUR SYSTEM <br /> 3. Disconnect the quick connect at the magnetic <br /> Insure release solenoid latch is engaged and remove base with Tee Assembly and remove the <br /> the cylinder valve safety pull pin from the extinguisher distribution assembly from underneath the range <br /> cylinder assembly (FIGURE 26) to arm system. hood. <br /> 4. Thoroughly flush distribution assembly with water <br /> CAUTION: Refer to initial installation, system to remove any residual fire suppressant. Inspect <br /> checkout, and activation instructions in this manual for distribution assembly (hoses, fittings, nozzles) for <br /> repositioning / re- aiming the nozzles and sensors leaks or other damage and wipe dry with a clean <br /> anytime they are moved, removed, or reinstalled. cloth. Set assembly aside and let completely dry. <br /> (See FIGURE 22 thru FIGURE 25) <br /> NOTE: If leaks or other damage is found in the <br /> distribution assembly, do not reinstall distribution <br /> assembly until those parts, which are leaking or <br /> damaged, have been replaced. See Parts List, <br /> Page 19, if required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.