��.I�� ��.a <br /> 6.7 5 Prior to removal of release film, align sheets properly starting at the low-point of the roof <br /> (eave) with the selvage edge upslope and for minimum 2-inch overhang at eaves and rakes <br /> Remove the lower piece of release film and bond to substrate and fold the overhanging 2-inch <br /> over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to <br /> substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load <br /> requirements. Install 1/8-inch troweling of LeakBusterT`" MatrixT"' 201 Premium SBS Flashing <br /> Cement over drip edge. <br /> 6.7.8 Continue upslope in a similar manner, maintaining minimum 4-inch side-Iz�ps and minimum 6- <br /> inch end-laps. Ensure all end laps are staggered at least 3-feet apart. End laps shall be sealed <br /> with a 1/16 to 1/8� inch thick trowel application of LeakBusterT`" Matrix"" 201 Premium SBS <br /> Flashing Cement. <br /> 6.7.9 Use a hand roller to firmly bond side and end laps. <br /> 6.8 WeatherWatchp: <br /> 6 8 1 WeatherWatch shall not be left exposed for longer than 30-days after installation <br /> 6.8 2 WeatherWatch shall be installed in compliance with the requirements for ASTM D1970 <br /> underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed <br /> 6.8.3 For tile roof installations governed by the FRSA/TRI 07320/8-05 Installation Manuai, Fourth <br /> Edition, use is limited to: <br /> � System 1, Option 5 or 6, Section 3.02E or F <br /> > System 2, Option 4 or 5, Section 3.02D or E <br /> 6.8.4 WeatherWatch� may be installed as a secondary water barrier using minimum 4-inch wide <br /> rolls to seal plywood deck joints prior to installation of the primary underlayment system <br /> 6.8.5 Back-nailing is required. Back-nailing shall consist of minimum 1-inch square or round cap <br /> nails spaced 18" o c within 3-inch side laps. <br /> 6.8.6 Prior to removal of release film, align sheets properly starting at the low-point of the roof <br /> (eave) with the selvage edge upslope and for minimum 2-inch overhang at eaves and rakes <br /> Remove the lower piece of release film and bond to substrate and fold the overhanging 2-inch <br /> over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to <br /> substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load <br /> requirements. Install 1/8-inch troweling of LeakBuster'"' MatrixT"' 201 Premium SBS Flashing <br /> Cement over drip edge <br /> 6 8 7 Continue upslope in a similar manner, maintaining minimum 3-inch side-laps and minimum 6- <br /> inch end-laps Ensure all end laps are staggered at least 18-inch apart. <br /> 6 8.8 Use a hand roller to firmly bond side and end laps <br /> Exterior Research and Design, LLC. Evaluation Report 01506.04.08 <br /> Certificate of Autho�ization #9503 FL10626 <br /> Date of Issuance: 04/25/2008 <br /> Page 7 of 9 <br />