Laserfiche WebLink
� • Mr. Joseph L. Oliveri <br /> Page4of6 <br /> February 17, 2011 <br /> Re: Facility Name: Florida Medical Clinic Special Procedures Center <br /> Project Name: Expansion <br /> Client Code/File-Project-Submission Number: 14/221-101-005 <br /> A-11 Sheet A1a: Show a 1-hour fire/smoke barrier designation symbol for the <br /> compartment wall between Smoke Compartment (SC) 1 and SC 2 <br /> A-12 Sheet A1 b: Provide 180-degree swing hinges at door 115 to the Electrical Room <br /> and coordinate with the door schedule. Florida Building Code, (FBC, 2007 edition <br /> with 2009 supplements), Section 421.3.4.1 <br /> A-13 Sheet A1 b: Reverse the door swings at Doors 118, 174, and 189b so the doors <br /> do not swing into the corridor. FBC, Section 421.3.4.1 <br /> A-14 Sheet A1 c: Provide a clinical sink in Soiled Work Room 136. The Guidelines, <br /> Chapter 3.7-3.1.2.1. (2) <br /> A-15 Sheet A1 c: Provide a hand washing station in Soiled Utility 134. The Guidelines, <br /> Chapter 3.7-3.1.2.'1 (2) <br /> A-16 Sheet A1 c: Revise the name of Soiled Utility 134 to "Soiled Holding" or add a <br /> work counter, hand-washing station, and clinical sink to this room. The <br /> Guidelines, Chapter 3.7-3.1.2.1(2) <br /> A-17 Sheet A1 c: Provide door closers for Soiled Utility Doors 134a and 134b in order <br /> to maintain the correct ventilation requirements. The Guidelines, Table 2 1-2 <br /> A-18 Sheet A3a: Provide scrub able ceiling tile clipped down or having a gasketed <br /> ceiling grid in the semi restricted sterile corridor area and adjoining rooms. The <br /> Guidelines, Chapter 3.7-52.2.2. (1)(a) <br /> A-19 Sheet A3a: Provide a ceiling access panel in the monolithic ceiling in existing <br /> Procedure R�om �75 so the fire rated barrier can be reviewed by the Office of <br /> Plans and Construction at time of survey. <br /> A-20 Sheet A9a: Provide a 45-minute fire rated door at Door 113. NFPA 101, Table <br /> 8.3.4.2 <br /> A-21 Sheet A9a: Provide a door closer in the hardware set for poors 150 and 174. <br /> NFPA 101, Chapter 8.4.3.5 <br /> MECHANICAL <br /> M-1 Sheet M0.1: Provide either flex master 8M or thermo flex MK-E for O.R and <br /> recovery area. See FBC Chapter 421.3.6.4. <br />