Laserfiche WebLink
ARTICLE 8. -GENERAL RESPONSIBlLITIES OF THE OWNER: <br /> 8.1 The Owner shali permit the Contractor ta use, at no extra cost, existing utifities such as <br /> light, heat, power, and water necessary fo� the proper execution and comp(etion of the <br /> work. <br /> 8.2 The Owner and occupants shali cooperate wi#h the Contractor to facilitate the pertor- <br /> mance of the work and are responsible for the removal or protection of rugs, furniture, <br /> and cfothing, if necessary. <br /> 8.3 The Owner and occupants shafl be responsible for the proper use and care of the <br /> prope�ty including all equipment and appliances. <br /> 8.4 The Owner shall provide the Contractor with access to the property during normal <br /> working hours on normal working days. <br /> ARTICLE 9. -GENERAL RESPONSlBILITIES OF THE COMMUNITY DEVELQPMENT DIVISION: <br /> 9.1 The Community Development Division shall. provide general administration of the <br /> contract, but it is understood by alf parties that the County is not a party to this Contract. <br /> 9.2 The Community Development Division shall make frequent inspections of the work while <br /> it is in progress to determine if it is proceedirtg in accordance with the contract dflcu- <br /> ments. <br /> � 9.3 The Community Development Division shall have the authority to reject work which does <br /> not conform to the contract documents. <br /> ARTICLE 10. - CONTRACT DOCUMENTS: This contract consists of the Bid Proposal, the Work <br /> Write-Up, incfuding any drawings or pians, the Genera! Bid Specifications, and any insurance policies specified <br /> in Article 5 above. <br /> ARTICLE 11. - CHANGES 1N THE WORK: Except in an emergency endangering life or property, no <br /> change in the work shall be made by the Contractor unless he has received a prior written order signed by the <br /> Owner and authorized representatives of the Communify Development Division. The contract sum and the <br /> contract time may be changed only by Change Order. No extra costs will be paid to the Contractor when he <br /> has neglected to praperty evaluate the extent of the construction work. Change orders need to be in line with <br /> bidding amounts or pricing. <br /> ARTICLE 12. - GUARANTEES AND WARRANTIES: The Contractor shafl guarantee to correct any <br /> wo�k that faifs to conform to the contract documents and shall correct such defects due to faulty materials, <br /> equipment, or workmanship which appear during the progress of fhe work or within a period of one year from <br /> the date of final inspection and acceptance or such longer periods of time as may be specified b� (aw or by <br /> terms of any special guarantees required by the contract documents. The provisions of this Article apply to <br /> work done 6y subcantractors as well as work done by the Contractor. Furthermore, the Contractor shall <br /> furnish the Owner, in care of the Community Development Division, with al! manufacturers' and suppliers' <br /> written guarantees and warranties cavering materials and equipment furnished under the contract. These <br /> documents are to be neatly organized and bound in a file type folder and submitted with the final pay request. <br /> If a warranty item malfunctions or breaks, the Contractor shall contact the Owner within 24 hours to schedule <br /> the �epair o�replacement of the item. The warranty item should be repaired or replaced within seven (7) days. <br /> SlCommunity UevelopmentlHousing Forms �v�s�����f� <br /> -4 - <br />