My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-14872
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-14872
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2014 1:39:39 PM
Creation date
11/11/2014 1:39:36 PM
Metadata
Fields
Template:
Building Department
Company Name
EAGLE RANCH
Building Department - Doc Type
Permit
Permit #
14-14872
Building Department - Name
KEYSTONE CHALLENGE FUND INC
Address
4614 EAGLE RANCH DR LOT 17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 8. -GENERAL RESPONSIBILITlES OF THE OWNER: <br /> 8.9 The Owner shafl pe�rnit the Contractor to use, at no extra cost, existing utilities such as <br /> ligh#, heat, power, and water necessary for the proper execution and completion of the <br /> work. <br /> 8.2 The Owne� and occupants shal! cooperate with the Contractor to facilitate the perfor- <br /> mance of the work and are responsible fo� the removal or protectian of rugs, furniture, <br /> and clo#hing, if necessary. <br /> 8.3 The Owner and occupants shall be responsible for the proper use and care of the <br /> property inciuding all equipment and appliances. <br /> 8.4 The Owner shali provide the Contractor with access to the property during normal <br /> working hours on normal working days. <br /> ARTICLE 9. -GENERAL RESPONSIBlLITIES OF THE COMMUNITY DEVELOPMENT D[VISION: <br /> 9.1 The Community Development Division shall provide general administration of the <br /> contract, but it is understood by all parties that the County is not a party to this Contract. <br /> 9.2 The Community Development Division shall make frequenf inspections of the work while <br /> it is in progress to determine if it is proceeding in accordance with the cont�act docu- <br /> ments. <br /> 9.3 The Community Development Division shall have#he authority to reject work which does <br /> not conform to the contract documents. <br /> ARTICLE 10. - CONTRACT DOCUMENTS: This contract consists of the Bid Proposal, the Work <br /> Write-Up, including any drawings or plans, the Genera! Bid Speci�cations, and any insurance policies specified <br /> in Article 5 above. <br /> ARTICLE 11. - CHANGES IN THE WORK: Except in an emergency endangering life or praperty, no <br /> change in the work shal! be rr�ade by the Contractor unless he has received a prior written order signed by the <br /> Owner and authorized representatives of the Community Development Division, The contract sum and the <br /> contract time rr�ay be changed only by Change Order. No extra costs wili be paid to the Contractor when he <br /> has neglected to properly evaivate the extent of the construction work. Change orders need to be in line w+th <br /> bidding amounts or pricing. <br /> ARTICI.E 12. - GUARANTEES AND WARRANTIES: The Contractor shall guarantee to correct any <br /> work that fails to conform to the contract documents and shall correct such defects due to faulty materials, <br /> equipment, or workmanship which appear during the progress of the work or within a period of one year from <br /> the date of final inspection and acceptance or such longer periods of time as may be speci�ed by law or by <br /> terms of any special guarantees required by the contract documents. The provisions of this Article apply to <br /> work done by subcontractors as well as work done by the Contractor. Furthermore, the Contractor shall <br /> fumish the Owner, in care of the Community Development Division, with afl manufacturers' and suppliers' <br /> written guarantees and warranties covering materials and equipment fumished under the contract. These <br /> documents are to be neatly organized and bound in a �le type folder and submitted with #he frnal pay request. <br /> If a warranty item malfunctions or breaks, the Contractor shall contact the Owner within 24 hours to schedule <br /> the repair or replacement of the item. The warranty item should be repaired or replaced wifhin seven (7}days. <br /> S/Community DevelopmentMousing Fortns Revised 04/27H f <br /> -�- <br />
The URL can be used to link to this page
Your browser does not support the video tag.